Success Story
Building a Project Controls Foundation for a Major Rail Program
About
A major transportation infrastructure initiative is building a new main line railway connecting two Western European cities to reduce travel time and support economic growth.
Industry
Transportation
Headquarters
Europe
Challenges
An Excel-driven environment could not support formal EVM requirements, leaving reporting disconnected, governance inconsistent and compliance at risk.
- Disconnected systems with no unified governance
- No real-time visibility or controlled reporting
- Inconsistent management of baselines and change
Solution
The contractor implemented Contruent Enterprise as a purpose-built EVM platform integrating cost, schedule and reporting within a standardized controls framework.
- Integrated with IFS and Primavera P6
- Standardized processes for updates and change
- Enabled adoption with implementation playbooks
Results
The contractor gained stronger visibility, alignment and controlled workflows to support scalable, audit-ready EVM execution.
- Real-time access with full auditability
- Alignment on reporting and performance metrics
- Transparent workflows for forecasting and claims
“We helped them stand up an environment in eight weeks instead of our usual 12.”


